Your ADU. One contractor. Zero headaches.
Uni Construction is a licensed general contractor specializing in ADU design and construction across Los Angeles and the San Gabriel Valley. We handle everything — design, engineering, permits, and build — so you get a stress-free experience from start to finish.
Uni Construction is licensed, bonded, and insured company that will service your project as a desigh-builder.
ADU Types We Serve
We build every type of ADU California allows:
Detached ADU — A standalone unit built separately on your property. Full custom design, site planning, and structural engineering included.
Attached ADU — Connected to your existing home with its own entrance, kitchen, and bathroom. Perfect when yard space is limited.
Garage Conversion — Transform your existing garage into a fully permitted living space. We evaluate your structure and handle all code upgrades.
Junior ADU (JADU) — A compact unit up to 500 sq ft created within your existing home. The most affordable ADU option with no new foundation required.
Existing Floor Conversion — Convert an underused floor of your home into a self-contained ADU. We maximize your existing layout with minimal disruption.

Service Areas
Uni Construction proudly serves homeowners across the San Gabriel Valley and greater Los Angeles area. Our general contractor services for ADU projects are available in:
Next Steps
Whether you need a brand-new detached ADU or a simple garage conversion, Uni Construction delivers quality builds on time and on budget. Contact us today for a free consultation. Contact us

Related Services
If you’re planning an ADU, explore ADU Design, Permitting, and Construction—or speak with our General Contractor team.



