Uni Construction - Pool Re-design in Pasadena - construction - cover

Pool Re-design in Pasadena

Client

Location

Year

Role

Type

Represented:

Concept & Objective

Uni Construction delivered pool redesign and outdoor living construction in Pasadena for Pool Re-design in Pasadena. The objective was to create a practical, well-coordinated Project that supports comfort, function, and long-term value.

We focused on efficient planning, clear documentation, and a buildable scope that supports smooth execution from early decisions through final delivery.

Uni Construction - Pool Re-design in Pasadena - construction - image 2
Uni Construction - Pool Re-design in Pasadena - construction - image 3

Inspiration

The inspiration focuses on a calm, resort-like outdoor experience—simple geometry, durable surfaces, and clean detailing. We balanced aesthetics with performance (slip resistance, weathering, and easy upkeep), tailoring the layout and material palette to the site context for Pasadena for this Project.

Uni Construction - Pool Re-design in Pasadena - construction - image 4

Project Detail

This Project in Pasadena was planned around comfort, safety, and durability. Uni Construction coordinated the scope for pool redesign and outdoor living construction with clear sequencing and buildable detailing to keep the work moving efficiently.

Key considerations included circulation around the pool, material performance in sun and water exposure, and finish selections that are attractive while remaining easy to clean and maintain.

The result is an upgraded outdoor area that feels cohesive, functional, and built for everyday use.

Uni Construction - Pool Re-design in Pasadena - construction - image 5
Uni Construction - Pool Re-design in Pasadena - construction - image 5

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us