brown wooden table and chairs

Residential

Kitchen Remodel at SFR (Walnut)

Client

Private Client

Location

Walnut (Diamond Bar), Los Angeles, CA

Year

2015

Role

Build

Type

Remodel

Represented:

Uni Construction

Concept & Objective

This kitchen remodel at a single-family residence revitalized the heart of the home to elevate both function and beauty. Uni Construction managed the entire project from the initial design meeting to the final touches, ensuring a stress-free and efficient experience for the homeowner.

Uni Construction - Kitchen Remodel at SFR (Walnut) - construction - image 2
Uni Construction - Kitchen Remodel at SFR (Walnut) - construction - image 3

Inspiration

Approach

We followed a clear process: initial consultation, design and material selection, permitting and ordering, demolition and construction, then installation and finishing touches—ending with final inspection and sign-off.

Uni Construction - Kitchen Remodel at SFR (Walnut) - construction - image 4

Project Detail

Project Scope

Comprehensive upgrade including removal of existing cabinets, countertops, appliances, flooring, and outdated fixtures; space planning and optimization; new cabinetry design and installation; new countertop selection and installation; appliance upgrades; new flooring; plumbing and electrical updates; a complete lighting plan (overhead, under-cabinet, and task); backsplash installation; and final finishes such as painting, trim, and hardware.

Uni Construction - Kitchen Remodel at SFR (Walnut) - construction - image 5
Uni Construction - Kitchen Remodel at SFR (Walnut) - construction - image 5

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us