A modern single-story house with a light exterior, a sloped roof, and well-maintained landscaping.

Residentials

Detached ADU in Highland

Client

Homeowner

Location

HighLand

Year

2021

Role

Design

Type

ADU

Represented:

Designer

Concept & Objective

Uni Construction delivered ADU design in Highland for Detached ADU in Highland. The objective was to create a practical, well-coordinated Detached ADU that supports comfort, function, and long-term value.

We focused on efficient planning, clear documentation, and a buildable scope that supports smooth execution from early decisions through final delivery.

A floor plan alongside a design illustration, showcasing room layouts and dimensions for a building project.
3D illustration of a modern house showing an open interior layout with exposed beams and stylish furnishings.

Inspiration

The inspiration for this ADU draws from modern California residential design: clean lines, warm textures, and durable finishes that feel timeless. We prioritized natural light, efficient circulation, and a cohesive palette that works with the site context for Highland—so the Detached ADU feels comfortable, bright, and easy to maintain.

A modern single-story house with a simple facade, front porch, and surrounding greenery under a clear blue sky.

Project Detail

This Detached ADU in Highland was planned with a focus on livability and straightforward execution. Uni Construction supported the project through design development, permitting coordination, and trade-ready documentation to reduce delays and keep decisions clear.

Key considerations included efficient circulation, thoughtful storage, and finish selections that are both attractive and low-maintenance—helping the ADU function well for guests, extended family, or rental use.

The end result is a polished space that improves property usability while aligning with common ADU goals: privacy, comfort, and long-term value.

A bright, modern living area featuring a sofa, dining table, and large windows with greenery outside.
A bright, modern living area featuring a sofa, dining table, and large windows with greenery outside.

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us