Uni Construction - Detached ADU - Arcadia Loma Verde - ADU design and construction - cover

Residentials

Detached ADU - Arcadia Loma Verde

Client

Homeowner

Location

Arcadia

Year

2023

Role

Design

Type

ADU

Represented:

Designer

Concept & Objective

Provided complete design service for new detached ADU in the Arcadia. Lot was tight due to existing swimming pool. We provided precise coordination so that structural integrity was not altered for both pool and the new ADU.

Uni Construction - Detached ADU - Arcadia Loma Verde - ADU design and construction - image 2
Uni Construction - Detached ADU - Arcadia Loma Verde - ADU design and construction - image 3

Inspiration

Our design approach focused on smart spatial planning and contextual integration. By maximizing natural light, optimizing circulation, and selecting high-quality yet practical materials, we delivered a home that feels spacious and warm despite its compact footprint. Architectural elements echo the main house’s language while introducing clean lines and contemporary detailing — a hallmark of Uni-CM’s commitment to refined, livable design.

Uni Construction - Detached ADU - Arcadia Loma Verde - ADU design and construction - image 4

Project Detail

The result is a turnkey ADU that delivers both everyday comfort and long-term value. From permitting through project delivery, Uni-CM managed every phase with clear communication, proactive coordination, and attention to detail. Homeowners now enjoy a beautifully crafted space that enhances their property’s functionality and market appeal — a testament to the thoughtful integration of design and build excellence.

Uni Construction - Detached ADU - Arcadia Loma Verde - ADU design and construction - image 5
Uni Construction - Detached ADU - Arcadia Loma Verde - ADU design and construction - image 5

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us