Uni Construction ADU design and construction in Pomona, California — location hero image

ADU Design

Pomona

Introduction

Pomona offers some of the best ADU investment potential in the eastern San Gabriel Valley. With more affordable land values compared to western SGV cities, construction costs go further here. Uni Construction designs permit-ready ADU plans for Pomona homeowners, handling everything from feasibility analysis through city permit approval.

Uni Construction ADU design and construction in Pomona, California — modern residential exterior inspiration

Why Pomona Homeowners Build ADUs

  • Highest ROI in the SGV: Lower property values mean your ADU construction cost represents a larger percentage gain in home value compared to pricier cities.

  • Large lots at affordable prices: Many Pomona properties have generous lot sizes with room for full detached ADUs.

  • University-driven rental demand: Cal Poly Pomona and Western University of Health Sciences create consistent demand for rental housing year-round.

  • Transit access: Pomona is served by Metrolink and multiple bus routes, which can eliminate your ADU’s parking requirement.

Uni Construction ADU design and construction in Pomona, California — architecture and construction planning inspiration
Uni Construction ADU design and construction in Pomona, California — architecture and construction planning inspiration

Local Permitting

Pomona has its own Planning Division that reviews ADU applications. The city follows California state ADU law and must process applications within 60 days. Pomona has adopted objective design standards for ADUs that are compatible with state requirements.

Neighborhoods We Serve

We design ADUs throughout Pomona including neighborhoods near Cal Poly, Downtown Pomona Arts Colony, Phillips Ranch, Westmont, Indian Hill, and the areas along Holt Avenue and Mission Boulevard.

 

Ready to build an ADU in Pomona? Contact us for a free feasibility report — we’ll evaluate your property and show you what’s possible. 213) 306-5601

Contact

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us