Uni Construction ADU design and construction in Pasadena, California — location hero image

Uni Construction

ADU in Pasadena

Introduction

Pasadena is one of the more complex cities for ADU design in Los Angeles County. With 16 historic landmark districts and strict design standards, your ADU plans need to be prepared by a team that understands Pasadena’s specific requirements. Uni Construction has experience designing ADUs that satisfy both state law and Pasadena’s objective design criteria.

Uni Construction ADU design and construction in Pasadena, California — modern residential exterior inspiration

Why Pasadena Homeowners Build ADUs

  • Premium rental rates: Pasadena’s desirability near Old Town, Caltech, and the Rose Bowl supports rental rates of $2,000–$3,500/month for a well-designed ADU.

  • Historic district protections (limited): Under AB 1061 (effective 2026), cities can only block ministerial ADU processing if your specific property is individually listed as a historic landmark — being in a historic district alone is no longer enough.

  • High property values: ADUs in Pasadena can add $150K–$300K+ to property value due to the city’s premium real estate market.

  • Transit accessibility: Gold Line stations eliminate parking requirements for ADUs within half a mile of stops.

Uni Construction ADU design and construction in Pasadena, California — architecture and construction planning inspiration

Local Permitting

Pasadena has its own ADU ordinance with objective design standards that include material, window proportion, and roof pitch requirements. Properties in Historic Preservation Overlay Zones (HPOZs) may face additional review — but state law limits how this can block your project. We handle all Pasadena-specific compliance.

Neighborhoods We Serve

We design ADUs throughout Pasadena including South Pasadena border, Bungalow Heaven, Madison Heights, San Rafael, Linda Vista, Hastings Ranch, and neighborhoods near Caltech and PCC.

 

Ready to build an ADU in Pasadena? Contact us for a free feasibility report — we’ll evaluate your property and show you what’s possible. 213) 306-5601

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us