Uni Construction ADU design and construction in Los Angeles, California — location hero image

Uni Construction

ADU in Los Angeles

Introduction

Los Angeles is the largest ADU market in California. The city has permitted tens of thousands of ADUs since 2017, and the pace continues to accelerate. Uni Construction designs permit-ready ADU plans for homeowners across LA, with particular expertise in the San Gabriel Valley, East LA, and the greater LA metro area.

Uni Construction ADU design and construction in Los Angeles, California — modern residential exterior inspiration

Why Los Angeles Homeowners Build ADUs

  • Massive rental demand: LA’s chronic housing shortage means well-designed ADUs rent quickly. Studio to 2-bedroom ADUs command $1,500–$3,500/month depending on location.

  • No owner-occupancy requirement: Under AB 976, you don’t need to live on the property. This makes ADUs viable for investors and homeowners who may move.

  • Sell your ADU separately: Under AB 1033, some LA neighborhoods now allow ADUs to be sold as separate condominiums.

  • Up to 3 units per lot: You can build a main home + ADU + JADU on a single-family lot, creating a triple-income property.

Uni Construction ADU design and construction in Los Angeles, California — architecture and construction planning inspiration

Local Permitting

The City of Los Angeles processes ADU permits through LADBS (Department of Building and Safety). LA has its own ADU ordinance under LAMC Section 12.22 A.31. The city uses both express and standard plan check paths. We handle LADBS submissions and corrections for all our LA clients.

Neighborhoods We Serve

We design ADUs across Los Angeles including East LA, Alhambra, Monterey Park, El Monte, South Pasadena, Eagle Rock, Highland Park, Boyle Heights, Silverlake, and the greater San Gabriel Valley.

 

Ready to build an ADU in Los Angeles? Contact us for a free feasibility report — we’ll evaluate your property and show you what’s possible. admin@uni-cm.com

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us