Uni Construction ADU design and construction in Glendale, California — location hero image

Uni Construction

ADU in Glendale

Introduction

Glendale has one of the highest ADU adoption rates in Los Angeles County. The city’s mix of single-family hillside homes and flatland properties provides diverse ADU opportunities. Uni Construction designs permit-ready ADU plans for Glendale homeowners, from small JADUs to full 1,200 sq ft detached units.

Uni Construction ADU design and construction in Glendale, California — modern residential exterior inspiration

Why Glendale Homeowners Build ADUs

  • Strong rental market: Glendale’s central location between DTLA, Burbank studios, and Pasadena creates premium rental demand. ADU rents range from $1,800–$3,000/month.

  • Hillside ADU potential: Glendale’s hillside homes often have lower-level space perfect for floor conversion ADUs with separate grade-level entries.

  • Property value boost: Glendale’s high property values mean an ADU addition can increase your home’s value by $200K–$350K+.

  • Armenian and multigenerational community: Glendale has a strong multigenerational family culture where ADUs serve as in-law suites, caretaker units, and young adult housing.

Uni Construction ADU design and construction in Glendale, California — architecture and construction planning inspiration

Local Permitting

Glendale has its own Community Development Department that reviews ADU permits. The city has adopted an ADU ordinance that aligns with state law. Hillside properties may have additional grading and fire access requirements. We navigate all Glendale-specific conditions.

Neighborhoods We Serve

We design ADUs throughout Glendale including Montrose, La Crescenta border, Sparr Heights, Adams Hill, Verdugo Woodlands, Rossmoyne, Kenneth Village, and Glendale Hills.

 

Ready to build an ADU in Glendale? Contact us for a free feasibility report — we’ll evaluate your property and show you what’s possible. 213) 306-5601 or admin@uni-cm.com

Contact

Together, We Shape the Extraordinary

Interested in working with us? Let’s bring your space to life.

brown wooden bed frame with white and brown bed linen

Contact Us

brown wooden bed frame with white and brown bed linen

Contact Us